Dhaka, Bangladesh. Available for innovation programmes.
Eleven years measuring how factories actually run.
I am an industrial engineer. I have spent my career inside textile, apparel and leather mills, planning production, cutting utility consumption and rebuilding the systems those factories depend on. I am now building Intelactory.
Where the time went
2014 to 2026
Industrial and production engineering
Entering the floor. Method study, line balancing, the measurement habits everything since has been built on.
Co-founder and Operations Manager
Boikhata.com.bd
One of Bangladesh's early e-commerce ventures. Business development, marketing and operations.
Production Planner, then Executive, Industrial and Production Engineering
Bitopi Group, Baridhi Garments Ltd., Cumilla EPZ
Built data-driven planning systems and real-time dashboards joining plant capacity, order status and resource availability. Implemented IE tools and quick changeover across sewing, cutting and finishing, and led operator skill training.
Head of Operations and Innovation
Textile Today Innovation Hub, Amin and Jahan Corporation Ltd.
Leading and coordinating more than twenty industrial innovation projects with factories and academic institutions. Managing Editor, TexSPACE Today.
Founder, Intelactory
Writing eleven years of manual practice down as software.
What I keep being called in to fix
The same failures, in different mills, over and over.
Every project below was scoped, run and closed by hand. What matters is not any single one of them. It is that the same failure classes kept recurring across unrelated factories, which is the point at which a problem stops being a job and starts being worth building software for.
| Failure class | Projects |
|---|---|
| Water, steam and energy consumption per shade depth | 6 |
| Neps and yarn quality upstream of the dyehouse | 3 |
| Dimensional variation: dia, GSM, shrinkage, lycra dropout | 3 |
| Right first time, lab to bulk and bulk to bulk | 2 |
| Denim wash defects: shrinkage and elastane breakage | 2 |
| Store and inventory synchronisation | 2 |
| Chemical management and wastewater, ZDHC | 1 |
| Pre-consumer waste returned to fabric | 1 |
| Production planning without live data | 1 |
| Changeover time and operator capability | 1 |